Talking about the operation of the belt vulcanizer, first tighten the bolts on the four corners of the belt vulcanizer with the same tightness; Three groups of four layers of gauze shall be laid on the surface of the original belt on both sides of the formed head, and the width shall be appropriate. Place it on the top of the sizing block. The fixed length of the flat vulcanizer to the head is that the joint length Ls should be 100mm longer at both ends of the longitudinal direction; Cover the upper hot plate and place the jack. Place the upper beam and start pressurizing. Two people shall operate at the same time, and pressurize gradually from one side in sequence, and then pressurize in reverse order to reach the rated pressure; Connect the circuit and exhaust once when the hot plate temperature rises to 135, and continue heating. When the hot plate temperature reaches 140, exhaust again, and then drain the condensate in the vulcanizer. When the hot plate temperature reaches 145, the curing time is calculated.
Please contact Epnuop Belt Vulcanization Equipment Factory for specific operation and look forward to your reply